Difference between revisions of "TZM Redesign-The Phoenix Project/Requirements and planning"
(Created page with "{{ProgrammingTeamNavigationMenu}} {{TZM_Redesign-The_Phoenix_Project}} '''FINAL TECHNICAL SPECIFICATIONS Mi...") |
m (Protected "TZM Redesign-The Phoenix Project/Requirements and planning" ([Edit=Allow only administrators] (indefinite) [Move=Allow only administrators] (indefinite))) |
(No difference)
|
Latest revision as of 09:13, 27 May 2014
Global Developers Team → About the Dev Team | GDT Environment Foundation | TZM 2.0/Phoenix Project | Projects Documentation | Contributors | Resources | Meetings| Wiki Use Help (edit)
TZM Redesign-The Phoenix Project → Project Adminstration→ Current Status → Project Personnel Table → Brainstorming → Final technical specifics (edit)
FINAL TECHNICAL SPECIFICATIONS Milestone Two End of August
--Boldhawk 13:22, 13 August 2011 (UTC)—Since the Atrium installation is now declared the collaborative space for the Phoenix Project, the Final Technical Specifications will be posted in the Atrium's Notebook.
section
This is the first section bla bla bla.
subsection
This is the first subsection bla bla bla.
sub-subsection
This is the first sub-subsection bla bla bla.
And here is a list of items:
- First item
- Second item
- Third item
- Comment to the third item and end signature 4v4l0n42 08:06, 26 June 2011 (UTC)
TZM Redesign-The Phoenix Project → Project Adminstration→ Current Status → Project Personnel Table → Brainstorming → Final technical specifics
(edit)
Global Developers Team → About the Dev Team | GDT Environment Foundation | TZM 2.0/Phoenix Project | Projects Documentation | Contributors | Resources | Meetings| Wiki Use Help (edit)